Lab 9.2.2 Creating a Phased Installation Plan

Step 1: Compare the installation methods
There are three possible installation methods:
  • New installation, commonly referred to as a green field installation
  • Phased installation into an existing, functioning network
  • Complete replacement, commonly referred to as a fork-lift upgrade
Consider and list the advantages and disadvantages of the three installation methods.
New Installation

Advantages:
Semua peralatan dan layanan dapat diinstal dan diuji pada saat yang sama.
Rencana implementasi untuk jaringan baru kurang kompleks dibandingkan dengan dua jenis instalasi.
Jadwal lebih fleksibel daripada ketika jaringan yang ada di tempat.
Ada gangguan minimal terhadap perusahaan.
Disadvantages:
Modal besar karena semua peralatan dan layanan yang diinstal pada waktu yang sama.
Phased Installation into Existing Network
Advantages:
Bagian-bagian dari upgrade jaringan diimplementasikan dalam isolasi dari bagian yang sedang berjalan.
Upgrade jaringan dibagi menjadi potongan-potongan kecil yang dapat diinstal dan diuji dengan cepat.
Instalasi upgrade secara bertahap yang lebih kecil menyebabkan sedikitnya jumlah downtime.

Disadvantages:
Sebuah penerapan secara bertahap membutuhkan perencanaan yang lebih rinci dengan pelanggan.
Complete Network Replacement

Advantages:
Jaringan yang ada bisa tetap beroperasi sepenuhnya sampai jaringan pengganti dibawa ke dalam produksi.

Disadvantages:
Kedua jaringan mungkin beroperasi secara paralel untuk beberapa waktu, yang meningkatkan biaya operasi dan dapat menyebabkan kebingungan dan dukungan bagi pemakai

Step 2: Select the installation method
Two of the FilmCompany requirements are:
  • The company network services must be available during the upgrade.
  • Existing equipment must be used in the new network design.
Select the appropriate installation approach for the FilmCompany network upgrade.
Pendekatan instalasi bertahap akan digunakan untuk proyek ini

Step 3: Complete the details for the installation phases
Using the charts created in Lab 9.2.1; fill out the information for each of the Installation Phases.
a. On the table created in Lab 9.2.1 for Phase 1, fill in the Task/Step, Description, and Implementation Details information:
  • Install Distribution and Core Layer equipment
  • Configure new IP addressing & VLAN scheme
  • Configure routing
b. On the table for Phase 2, fill in the Task/Step, Description, and Implementation Details information:
  • Upgrade the WAN connectivity
  • Extend the network to the remote site
  • Configure Access Control Lists & security
c. On the table for Phase 3, fill in the Task/Step, Description, and Implementation Details information:
  • Install and configure the wireless and associated mobility network equipment

Komentar

Postingan populer dari blog ini

Lab 4.2.5.5 Calculating a VLSM Addressing Scheme

Lab 5.2.3 Configuring RIPv2 with VLSM, and Default Route Propagation

Lab 7.3.3 Configuring and Testing the Rapid Spanning Tree Prototype